• 12r22.5 295/80/22.5 315/80/22.5 Truck Tyres 315 80 R 22.5 Heavy Truck Tyre Weights Dovroad/Truefast/Bossway
  • 12r22.5 295/80/22.5 315/80/22.5 Truck Tyres 315 80 R 22.5 Heavy Truck Tyre Weights Dovroad/Truefast/Bossway
  • 12r22.5 295/80/22.5 315/80/22.5 Truck Tyres 315 80 R 22.5 Heavy Truck Tyre Weights Dovroad/Truefast/Bossway
  • 12r22.5 295/80/22.5 315/80/22.5 Truck Tyres 315 80 R 22.5 Heavy Truck Tyre Weights Dovroad/Truefast/Bossway
  • 12r22.5 295/80/22.5 315/80/22.5 Truck Tyres 315 80 R 22.5 Heavy Truck Tyre Weights Dovroad/Truefast/Bossway
  • 12r22.5 295/80/22.5 315/80/22.5 Truck Tyres 315 80 R 22.5 Heavy Truck Tyre Weights Dovroad/Truefast/Bossway

12r22.5 295/80/22.5 315/80/22.5 Truck Tyres 315 80 R 22.5 Heavy Truck Tyre Weights Dovroad/Truefast/Bossway

After-sales Service: 1 Year
Warranty: 1 Year
Kind: Vacuum Tire
Diameter: 16′′- 20′′
Tire Design: Radial Tyre
Certification: ECE, ISO9001, DOT
Samples:
US$ 180/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2010

Suppliers with verified business licenses

Rating: 5.0/5
Manufacturer/Factory

Basic Info.

Model NO.
12r22.5 315/80r22.5 295/80R22.5
Tread Pattern
Circumferential Pattern
Tire Hierarchy
18PR
Cord Material
Steel Wire
Inner Tube
Tubeless
Customized
Non-Customized
Condition
New
Load Index
152/149
Speed Rating
F
Max Pressure
930 Kpa
Section Width
300 mm
Kg Load
3550/3250 Kg
Tread Ddpth
15 mm
Truck Model
All Truck
Wheel Position
All Position
Company Type
Manufacturer
Std.Rim
9.00
Transport Package
Standard Exporting Packing or Plastic Packing or a
Specification
DD512
Trademark
DOVROAD/TRUEFAST/BOSSWAY
Origin
Shandong
HS Code
401120
Production Capacity
50000pieces /Month

Product Description

12R22.5 295/80/22.5 315/80/22.5 Truck Tyres 315 80 r 22.5 Heavy Truck Tyre Weights DOVROAD/TRUEFAST/BOSSWAY

FEATURES:
1. Unique tread belt structure, tire tread compound with high wear-resistance and low heat generation;

2. Extended road mileage, excellent traction performance and steerability;
3. Fuel economy, superior high-speed performance;
4. Optimized and reinforced tire bead design;
5. Being especially suitable for the requirement of the specila service condition;
6. Radial carcass to make riding comfortable;
7. Reduction of wearing of vehicle parts.

12r22.5 295/80/22.5 315/80/22.5 Truck Tyres 315 80 R 22.5 Heavy Truck Tyre Weights Dovroad/Truefast/Bossway

Specification:
Size: DOVROAD/TRUEFAST/BOSSWAY
12r22.5 315/80r22.5 295/80R22.5
Certificate: DOT, ECE, CCC, ISO

Mileage: 190,000-200,000km

Warranty: 100,000-120,000km
Delivery: Within 15-20 working days after receiving deposit.
Characters: Smartway Verified Closed Shoulder For Driving Position
12r22.5 295/80/22.5 315/80/22.5 Truck Tyres 315 80 R 22.5 Heavy Truck Tyre Weights Dovroad/Truefast/Bossway
12r22.5 295/80/22.5 315/80/22.5 Truck Tyres 315 80 R 22.5 Heavy Truck Tyre Weights Dovroad/Truefast/Bossway
12r22.5 295/80/22.5 315/80/22.5 Truck Tyres 315 80 R 22.5 Heavy Truck Tyre Weights Dovroad/Truefast/Bossway12r22.5 295/80/22.5 315/80/22.5 Truck Tyres 315 80 R 22.5 Heavy Truck Tyre Weights Dovroad/Truefast/Bossway
 
Packing&Shipping:
12r22.5 295/80/22.5 315/80/22.5 Truck Tyres 315 80 R 22.5 Heavy Truck Tyre Weights Dovroad/Truefast/Bossway12r22.5 295/80/22.5 315/80/22.5 Truck Tyres 315 80 R 22.5 Heavy Truck Tyre Weights Dovroad/Truefast/Bossway
FAQ  

(1). What is your MOQ?
       Our MOQ is a 20 FT container.

(2). how to ship?

      1) based on CNF, we will effect shipment and furnish the master bill of lading issued by shipping line.

      2) based on CIF, we will effect shipment and furnish the master bill of lading issued by shipping line and we will settle 

the insurance issue.

      3) based on FOB, buyer should nominated shipping line and furnish the Agreement NO. betweem buyer and the shipping line    

      4)if transportation is settled by train or by train, we will discuss with buyer to get agreement with each other on details.

(3). how to pay?

     1) by 30%TT in advance, balance paid 7days before goods loading.

     2) by 30% TT in advance, balance against B/L copy paid within 7 days after Bill of lading date.

     3by irrevocable L/C at sight.  

(4). Package & Delivery?

 1) No packing or in bulk or exporting standard packing.

2) 15 days after receiving deposit

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2010

Suppliers with verified business licenses

Rating: 5.0/5
Manufacturer/Factory
Management System Certification
ISO 9001, ISO 14001, IATF16949
International Commercial Terms(Incoterms)
FOB, CFR, CIF, DDP, DAP, EXW